SECTION 55. Disposition of Miscellaneous Bureau
Receipts . — In the absence of special provision, money
collected for property sold or service rendered, and all
other
receipts
or
earnings
of
bureaus,
offices,
and
agencies not derived from taxation, shall accrue to the
general
unappropriated
funds
of
the
National
Government.
SECTION 56. Printing of Studies and Researches . —
With the approval of the Secretary, a bureau, office, or
agency may print its studies, researches and similar
materials for distribution at cost to the public. The
Secretary may authorize the printing or reprinting of the
said materials by private persons for sale to the public
upon payment of such royalties as may be fixed by him,
which shall accrue to the general fund.
CHAPTER 13 Contracts
SECTION 57. Conveyances and Contracts to which
the Government is a Party . — Any deed, instrument or
contract conveying the title to real estate or to any other
property the value of which does not exceed fifty million
pesos (P50,000,000) awarded through public bidding,
and five million pesos (P5,000,000) awarded through
negotiation,
shall
be
executed
and
signed
by
the
respective Secretary on behalf of the Government of the
Philippines. Where the value of the property exceeds the
aforesaid ceilings, such deed, instrument or contract shall
be
executed
and
signed
by
the
President
of
the
Philippines on behalf of the Government.
SECTION 58. Ceiling for Infrastructure Contracts . —
The following shall be the ceilings for all civil works,
construction
and
other
contracts
for
infrastructure
projects, including supply contracts for said projects,
awarded through public bidding or through negotiation,
which may be approved by the Secretaries of Public
Works
and
Highways,
Transportation
and
Communications,
Local
Government
with
respect to
Rural Road Improvement Project, and governing boards
of government-owned or controlled corporations:
Awarded
through
Public
Bidding
Awarded
through
Negotiation
a. Secretary of Public
Works and Highways
P100 Mil.
P10 Mil.
b. Secretary of
Transportation and
Communications
100 Mil.
10 Mil.
c. Secretary of Local
Government with
respect to the Rural
Road Improvement
Project
100 Mil.
2 Mil.
d. Government Boards of
Infrastructure
Corporations (National
Power Corporation,
National Irrigation
Administration,
Metropolitan
Waterworks and
Sewerage System,
National Housing
Authority, Philippine
Port Authority, National
Electrification
Administration, Export
Processing Zone
Authority, Philippine
National Railways, Local
Water Utilities
50 Mil.
5 Mil.
Administration, Light
Rail Transit Authority
and Philippine National
Oil Company)
e.
Governing Boards of
Non-Infrastructure
Corporations
7.5 Mil.
1 Mil.
Save as provided for above, the approval ceilings
assigned
to
the
departments/agencies
involved
in
national infrastructure and construction projects shall
remain at the levels provided in existing laws, rules and
regulations.
SECTION 59. Contracts for Approval by the President .
—
Contracts
for
infrastructure
projects,
including
contracts for the supply of materials and equipment to be
used in said projects, which involve amounts above the
ceilings
provided
in
the
preceding section shall be
approved by the President: Provided , That the President
may,
when
conditions
so
warrant,
and
upon
recommendation
of
the
National
Economic
and
Development Authority, revise the aforesaid ceilings of
approving authority.
SECTION 60. Approval of Consultancy Contracts . —
All purely consultancy contracts relating to infrastructure
projects, regardless of amount, shall be approved by the
Secretaries concerned, in accordance with the Guidelines
on the Hiring of Consultants to be promulgated by the
National Economic and Development Authority: Provided ,
That the National Economic and Development Authority
shall be furnished by the departments, agencies or
government
corporations
concerned,
copies
of
all
consultancy contracts entered into by them involving an
amount in excess of P1 million for monitoring purposes.
SECTION 61. Delegation of Authority to Governing
Boards of Government Corporations . — The Secretaries
are authorized to delegate to the governing boards of
government-owned or controlled corporations which are
attached to or are under the administrative supervision of
their respective departments, the authority to approve
contracts for infrastructure projects entered into by said
corporations involving amounts which are beyond the
ceiling
provided
for
government
corporations
under
Section 57 hereof but which are within the approving
authority of the Secretaries under the said Section. In the
case of government corporations which are attached to
or under the Office of the President, the delegation shall
be made by the Executive Secretary.
SECTION 62. Public Bidding of Contracts ; Exceptions .
— As a general rule, contracts for infrastructure projects
shall be awarded after open public bidding to bidders
who submit the lowest responsive/evaluated bids. Open
Public Bidding shall be conducted among prequalified
contractors
in
accordance
with
laws,
rules
and
regulations not inconsistent with the provisions of this
Chapter.
The
award
of
such
contracts
through
negotiation shall only be allowed by the Secretary or
Governing Board of the Corporation concerned within the
limits as stated in Section 57 hereof in the following cases:
a.
In
times
of
emergencies
arising
from natural
calamities
where
immediate
action
is
necessary
to
prevent imminent loss of life or property, in which case,
direct
negotiation
or
simplified
bidding
may
be
undertaken;
b. Failure to award the contract after competitive
public bidding for valid cause or causes, in which case,
simplified bidding may be undertaken; and
c. Where the construction project covered by the
contract is adjacent or contiguous to an on-going project
and it could be economically prosecuted by the same
contractor, in which case, direct negotiation may be
undertaken with the said contractor at the same unit
prices and contract conditions, less mobilization costs,
provided that he has no negative slippage and has
© Compiled by RGL
19 of 162
Use With Care
Definitions and exceptions often appear before or after this text.
Court decisions may interpret, limit, or apply this provision.
Confirm amendment, repeal, effectivity, and official publication.