Concrete Barangay Roads/Multipurpose Pavements Program. - The Department of Public Works and Highways (DPWH) shall undertake the construction of concrete barangay roads/multipurpose pavements in all barangays throughout the country: Provided, That any such construction is based on a program prepared by the DPWH in coordination with the Representative of the legislative district and the Municipal or City Development Council: Provided, further, That the barangay council shall assume full supervision and control of projects with a maximum length of 100 meters: Provided, further, That these concrete barangay roads/multipurpose pavements shall be located in the population center of the barangay: Provided, furthermore, That based on a classification by population and area to be formulated by the DPWH, barangays shall be classified into small, which shall have a 100-meter road/pavement; medium, which shall have a 200-meter road/pavement; and large, which shall have a 300-meter road/pavement: and Provided, finally, That the municipal mayor and the barangay captain shall be furnished with pertinent documents, data and information before any construction can be commenced.
Use With Care
Definitions and exceptions often appear before or after this text.
Court decisions may interpret, limit, or apply this provision.
Confirm amendment, repeal, effectivity, and official publication.