The ERC shall, in determining the existence of market
power abuse or anti-competitive behavior, require from
generation companies the submission of their individual
pricing formulas as well as their financial statements.
Section 7. Transmission Sector. - The transmission of
electric power shall be a regulated common electricity
carrier business, subject to the ratemaking powers of the
ERC.
The
ERC
shall
set
the
standards
of
the
voltage
transmission
that
shall
distinguish the transmission
from the subtransmission assets. Pending the issuance
of such new standards, the distinction between the
transmission and subtransmission assets shall be as
follows: 230 kilovolts and above in the Luzon Grid, 69
kilovolts and above in the Visayas and in the isolated
distribution systems, and 138 kilovolts and above in the
Mindanao Grid: Provided, That for the Visayas and the
isolated distribution system, should the 69 kilovolt line
not form part of the main transmission grid and be
directly connected to the substation of the distribution
utility, it shall form part of the subtransmission system.
Section
8.
Creation
of
the
National
Transmission
Company.
-
There
is
hereby
created
a
National
Transmission
Corporation,
hereinafter
referred
to as
TRANSCO,
which
shall
assume
the
electrical
transmission function of the National Power Corporation,
and have the powers and functions hereinafter granted.
The
TRANSCO
shall
assume
the
authority
and
responsibility of NPC for the planning, construction and
centralized
operation
and
maintenance
of
its
high
voltage
transmission
facilities,
including
grid
interconnections and ancillary services.
Within six (6) months from the effectivity of this Act, the
transmission and subtransmission facilities of NPC and
all
other
assets
related
to
transmission
operations,
including
the
nationwide
franchise of NPC for the
operation of the transmission system and the grid, shall
be transferred to the TRANSCO. The TRANSCO shall be
wholly owned by the Power Sector Assets and Liabilities
Management Corporation (PSALM Corp.).
The
subtransmission
functions
and
assets
shall
be
segregated from the transmission functions, assets and
liabilities for transparency and disposal: Provided, That
the
subtransmission
assets
shall
be
operated
and
maintained by TRANSCO until their disposal to qualified
distribution utilities which are in a position to take over
the responsibility for operating, maintaining, upgrading,
and
expanding
said
assets.
All
transmission
and
subtransmission
related
liabilities
of
NPC
shall
be
transferred to and assumed by the PSALM Corp.
TRANSCO shall negotiate with and thereafter transfer
such functions, assets, and associated liabilities to the
qualified distribution utility or utilities connected to such
subtransmission facilities not later than two (2) years
from the effectivity of this Act or the start of open
access, whichever comes earlier: Provided, That in the
case of electric cooperatives, the TRANSCO shall grant
concessional financing over a period of twenty (20) years:
Provided, however, That the installment payments to
TRANSCO for the acquisition of subtransmission facilities
shall be given first priority by the electric cooperatives
out of the net income derived from such facilities. The
TRANSCO shall determine the disposal value of the
subtransmission assets based on the revenue potential
of such assets.
In
case
of
disagreement
in
valuation,
procedures,
ownership participation and other issues, the ERC shall
resolve such issues.
The
take
over
by
a
distribution
utility
of
any
subtransmission asset shall not cause a diminution of
service and quality to the end-users. Where there are
two
or
more
connected
distribution
utilities,
the
consortium or juridical entity shall be formed by and
composed of all of them which has been granted a
franchise to operate the subtransmission asset by the
ERC. The subscription rights of each distribution utility
involved
shall
be
proportionate
to
their
load
requirements unless otherwise agreed by the parties.
Aside from the PSALM Corp., TRANSCO and connected
distribution utilities, no third party shall be allowed
ownership or management participation, in whole or in
part, in such subtransmission entity.
The
TRANSCO may exercise the power of eminent
domain subject to the requirements of the Constitution
and existing laws. Except as provided herein, no person,
company or entity other than the TRANSCO shall own
any transmission facilities.
Prior to the transfer of the transmission functions by
NPC to TRANSCO, and before promulgation of the Grid
Code, ERC shall ensure that NPC shall provide to all
electric
power
industry
participants
open
and
non-discriminatory access to its transmission system.
Any violation thereof shall be subject to the fines and
penalties imposed herein.
Section 9. Functions and Responsibilities. - Upon the
effectivity of this Act, the TRANSCO shall have the
following functions and responsibilities:
(a)
Act
as
the
system
operator
of
the nationwide
electrical transmission and subtransmission system, to
be transferred to it by NPC;
(b) Provide open, equal and non-discriminatory access to
its transmission system to all electricity users;
(c)
Ensure
and
maintain
the
reliability,
adequacy,
security,
stability
and
integrity
of
the
nationwide
electrical
grid
in
accordance with the performance
standards for the operation and maintenance of the grid,
as
set
forth
in
a
Grid
Code
to
be
adopted
and
promulgated by the ERC within six (6) months from the
effectivity of this Act;
(d)
Improve
and
expand
its
transmission
facilities,
consistent with the Grid Code and the Transmission
Development Plan (TDP) to be promulgated pursuant to
this Act, to adequately serve generation companies,
distribution utilities and suppliers requiring transmission
service
and/or
ancillary
services
through
the
transmission
system:
Provided,
That
TRANSCO shall
submit any plan for expansion or improvement of its
facilities for approval by the ERC;
(e) Subject to technical constraints, the grid operator of
the
TRANSCO
shall
provide
central
dispatch
of
all
generation facilities connected, directly or indirectly, to
the transmission system in accordance with the dispatch
schedule submitted by the market operator, taking into
account outstanding bilateral contracts; and
(f) TRANSCO shall undertake the preparation of the TDP.
In the preparation of the TDP, TRANSCO shall consult the
other
sectors
of
the
power
industry
such
as
the
generation
companies, distribution utilities, and the
electricity end-users. The TDP shall be submitted to the
DOE
for
integration
with
the
Power
Development
Program and the National Energy Plan, provided for in
Republic
Act
No.
7638
otherwise
known
as
"the
Department of Energy Act of 1992".
A generation company may develop and own or operate
dedicated point-to-point limited transmission facilities
that are consistent with the TDP: Provided, That such
facilities are required only for the purpose of connecting
© 2018 Compiled by RGL
85 of 244
Use With Care
Definitions and exceptions often appear before or after this text.
Court decisions may interpret, limit, or apply this provision.
Confirm amendment, repeal, effectivity, and official publication.